Healthcare Solution Division
Optimizing the healthcare supply chain. We provide high-quality logistics compliant with GDP standards.
Overview
We deliver safe and reliable transportations for healthcare products
- including pharmaceuticals, medical devices, reagents, cosmetics,
and food,
supported by temperature control, secure storage
systems, and emergency response tailored to on-site needs.
We support procurement, production, distribution logistics,
warehouse and on-site operations in the healthcare industry,
ensuring stable and continuous service.
By meeting specialized quality requirements, we utilize our
transportation network to deliver nationwide.
Our four strengths
-
Nationwide network
Leveraging approximately 28,000 company-owned vehicles and a nationwide partner network, we ensure stable and reliable vehicle availability. And one-stop services from storage to delivery, supported by warehouse facilities total of approximately 370,000 tsubo (1.22 million m2).
01
-
GDP : Good Distribution Practice
Transportation services in compliance with GDP standards. Temperature is monitored by using temperature data loggers, and vehicle locations are tracked by GPS, and a dedicated representative of each customer supports immediately for irregular case.
02
-
Logistics Services
We provide one-stop services covering inbound and outbound operations, storage, inventory management, distribution processing for pharmaceuticals and medical devices delivering optimized logistics solutions.
03
-
Global Logistics
CEIV Pharma certified in December 2022, we ensure safe and compliant transportation of pharmaceuticals, vaccines, clinical samples, and reagents requiring strict temperature control. With a global network of approximately 1,100 locations covering 96% of the world market, we deliver reliable door-to-door logistics from and to Japan worldwide.
※ CEIV Pharma is an IATA-established certification that sets a global quality standard for pharmaceutical air transportation. It integrates GDP requirements worldwide and aims to ensure a high-quality supply chain that maintains product integrity throughout transportation.
04
Case examples of handling
Pharmaceuticals
-
FTL of pharmaceuticals
Refrigerated transportation by FTL compliant with GDP (Good Distribution Practice for pharmaceutical products) is available through temperature-control monitoring, training, and an abnormality monitoring system.
01
-
Pharmaceutical Storage
Compatible with storage for pharmaceutical manufacturers. We provide support for licenses and permits, stationing of pharmacists, and appropriate temperature control, as well as pest and rodent control.
02
Medical devices
-
Medical device storage
We consolidate medical devices in large warehouses (from storage to shipment approval to delivery). We have acquired a medical device manufacturing license and can serve multiple customers.
01
Operation of logistics within customers’ premises
-
On-site operations for Pharmaceutical Manufacturer A
We operate logistics operations within Company A’s warehouse.
Our customers have evaluated us by saying that they can ‘focus on their core business’ , ‘staffing concerns have been resolved,’ and ‘productivity has improved. In addition to the above case, we are also entrusted with in-plant logistics operations for multiple pharmaceutical manufacturers.01
-
On-site operations for Medical Device Wholesaler B
We are responsible for operating SPD (Supply, Processing and Distribution) services within Company B’s warehouse.
Our customers have evaluated us as providing “tremendous trust,” “high quality,” and “improved productivity.02
Multi-location operations
-
Supply center operations
Leave the multi-location operations of your stores nationwide to Seino Transportation.
We will help you strengthen your delivery times.01
Service
-
Transport
With a nationwide network, we handle GDP-compliant pharmaceutical transportation and charter services. By building optimal plans for a wide range of needs—such as charter, specialized transport, and small-lot consolidated shipments—we provide reliable, tailor‑made logistics that closely support your business.
Learn More -
Warehouse Management
We offer one-stop logistics services from storage and inventory control to inbound,outbound operations and delivery, tailored to the specific requirements of pharmaceuticals, medical devices, cosmetics, and food products. With approximately 370,000 tsubo (1.22 million m2) of warehouse space, we can also operate customers’ warehouse operations on their behalf with well-trained, highly qualified personnel.
Learn More -
International
Our network of locations covers about 96% of the global market and is directly connected to our strong domestic transport network. By fully leveraging land, sea, and air, we provide one‑stop transportation from overseas to every corner of Japan. With the high reliability demonstrated by IATA pharmaceutical transport quality certification, we offer high‑quality international logistics.
Learn More
Our logistics professionals will propose the best solutions for your needs.
For consultations or document requests, please feel free to contact us from the options below.